CURRENT
PROJECTS

07
Active Contracts
3
States
118K+
Linear Feet in Field
87K+
Sq Yds Pavement
MA Boston

BWSC Water & Sewer Rehabilitation

Contract 19-308-004
Back Bay · Beacon Hill · City Proper
Water System Sewer / Drain Paving
10,000
LF Water Main (4"–16")
4,500
LF Pipe Rehabilitation
130
New Gate Valves
30
New / Reset Hydrants
1,200
LF HDPE Liner (48")
10K
SY Temporary Paving
Coordination — Active operations at Mass General Hospital, Mass Eye & Ear, Liberty Hotel, Boston Common
MA Chelsea

CHE-004 Phase 1 Improvements

CHE-004 — Phase 1
Downtown Broadway Corridor
Sewer / Drain Water System Paving Fiber Optic
7,300
LF Sewer (8"–24")
3,000
LF Fiber Optic Duct Bank
2,000
LF Water Main (4"–16")
1,100
Tons Temp Paving
Lead Service — 1,000 LF service replacement with lead pipe removal
NH Manchester

CMOM Contract 5 Sewer Rehabilitation

CMOM — Contract 5
Sewer / Drain Directional Drill Paving
13,000
LF Sewer Rehab (8"–24")
28
Point Repairs
400
LF Directional Drill
5
Culvert Projects
Multi-Site — Cohas Brook Siphon · Marjam · Mammoth Rd · Massabesic St · Spruce St culverts + Namaske Lake boat ramp
MA Methuen

Arlington Neighborhood Improvements Ph. 1

Phase 1 — Active
Water System Sewer / Drain Paving
14,000
LF Sewer (6"–48")
6,000
LF Water Main (6"–16")
17,800
SY Temporary Paving
120
New Manholes / Catch Basins
Rock Excavation — 1,000 CY removal, handling & disposal on site
MA North Andover

Willows & Jasmine Pump Station Rehab

Pump Station Rehabilitation
Pump Station Sewer System Paving
2
Pump Stations Demo'd
1
New Submersible PS
1,300
LF Sewer Pipe (8"–10")
1,200
SY Permanent Paving
Utility Coordination — Active coordination with National Grid throughout construction
ME York

Donica Road Sewer Expansion

Sewer Expansion Project
Sewer System Dir. Drilling + PS Paving
6,000
LF Sewer (1.5"–8")
17
New Manholes
3,200
CY Rock Excavation
3,100
SY Permanent Paving
MA Lowell

Centralville Phase 1 — Mainline Conduit & Separation Outfall

Phase 1 — Mainline Conduit & Separation Outfall
Water System Sewer System Drain System Paving CIPP Liner ADA Streetscape
7,800
LF Sewer Pipe (8"–18")
7,600
LF Water Main (6"–12")
8,400
LF Drain Pipe (12"–60")
20,000
SY Temp + 20K Permanent Paving
10,000
LF CIPP Liner
5,400
CY Rock Excavation
90
New Gate Valves
4,000
SY ADA Concrete Walks
Bunker Hill Outfall — Cast-in-place Junction Chamber + box culvert section · 2×30" water main abandonments · 12,000 SY mill & overlay · 400 LF new + 6,000 LF reset granite curbing