Every system our crews delivered on this contract, item by item.

Sturges Pump Station

05
  • 23 foot deep excavation
  • Replace existing station with new wet well and valve vault
  • New section of force main, gravity sewer and new grinder
  • Install emergency generator and new electrical control panel
  • Site work restoration and paving

Charles Street Pump Station

12
  • Improvements to the existing Charles Street Wastewater Pumping Station
  • New submersible wastewater pump station
  • New valve vault
  • New flow meter and meter vault
  • New section of force main
  • New wastewater grinder
  • Wet well modifications
  • New emergency generator
  • New electrical control panel
  • Demolition of existing wastewater pump station
  • By-pass pumping
  • Excavation depth exceeded 32 feet deep in ledge