Cold planing removes failed surface course and profiles the roadway for overlay. We self-perform milling in sequence with paving for tight project control.
Full-width and partial-depth milling with depth control.
Manhole, valve, and catch basin adjustment to milled grade.
Milled surface cleaning and tack coat before overlay.
Milled asphalt loaded and transported for recycling.
Milling and overlay sequenced under one contract.
Milling staged to keep lanes open during work.
The Field
Protocol
Milling sequences survey, mill, clean, and pave. Overlay goes down within the same shift when possible.
Milling depth and limits marked in field.
Cold planing with depth control and material removal.
Manhole and valve covers ground to milled elevation.
Tack coat and paving crew mobilization for surface course.
Where We
Get Called In
Municipal overlay programs, utility trench transitions, and full-width reconstruction prep.
Town-wide milling and overlay programs.
Milling over utility trenches before permanent patch.
Full intersection milling and repaving.
Commercial lot milling and surface course replacement.
Deep milling as part of full-depth reconstruction.
Profile correction milling for ride quality improvement.
Operational
Standards
Milling depth and cross-slope controlled to spec. Transition grinding at structures before overlay.
Milled surface is cleaned and tacked before overlay placement. Manhole and valve covers ground flush to milled grade.
Milled material loaded and hauled for recycling. Depth verified by survey before paving crew mobilization.
Explore More
Other Services
Ready to
Plane Pavement?
Send pavement section and milling depth. We will scope cold planing and overlay sequence.