Stoneham

MWRA Contract 7067, Stoneham

Massachusetts Water Resources Authority

Client: Massachusetts Water Resources Authority

Project Details

Every system our crews delivered on this contract, item by item.

Water System

04
  • Installed 13,200 feet of 48-inch ductile iron water main and 9 butterfly valves
  • Connection to Section 110 36-inch water main at Gillis Pump Station
  • Connection to Section 110 48-inch water main at Cottage Street
  • Installation of 2,500 feet of 8-inch ductile iron water main and 22 gate valves

Site & Coordination

04
  • 48-inch x 36-inch tee
  • 36-inch RSGV in 8' x 8' ID pre-cast concrete vault
  • 6-inch bypass valve and pipeline
  • Installation of 3 hydrants

Sewer System

01
  • Installing valves, precast valve vaults, air valves, blow-off assemblies, manholes

Rock Excavation

02
  • Removal, handling, transportation and disposal of 16,000 cubic yards of rock
  • Contaminated soil and groundwater