Massachusetts Completed C06 / 18

Stoneham & Wakefield

MWRA Contract 7478, Stoneham & Wakefield

Massachusetts Water Resources Authority
Completed September 13th, 2018

Client: Massachusetts Water Resources Authority

Project Details

Every system our crews delivered on this contract, item by item.

Water System

08
  • Installed 7,200 feet of 48-inch ductile iron water main and 6 butterfly valves
  • Installation of 485 feet of 48-inch steel water main
  • Installation of 150 feet of 36-inch ductile iron water main and appurtenances
  • Installation of 100 feet of 24-inch ductile iron water main three 3 gate valves
  • Installation of 1,650 feet of 16-inch ductile iron water main 1 gate valve
  • Connections to existing Section 110 36" water main and Section 89B 24" water main
  • Installation of 5,500 feet of 6-inch to 12-inch ductile iron water mains and gate valves
  • Installation of 25 feet of 130-inch by 73-inch corrugated metal pipe culvert at Sweetwater Brook

Sewer System

03
  • Installing valves, precast vaults, air valves, blow-off assemblies, and manholes
  • Installation of 1,500 feet of 8-inch to 30-inch drain lines and manhole structures
  • Installation of 1,600 feet of 4-inch to 12-inch sanitary sewer lines and manhole structures

Site & Coordination

01
  • Installing one new meter in underground vaults with electrical and communications equipment

Rock Excavation

02
  • Removal, handling, transportation and disposal of 10,000 cubic yards of rock
  • Contaminated soil and groundwater