Massachusetts Completed C09 / 18

Plymouth

Emergency Wastewater Force Main Repairs

Town of Plymouth, MA
Completed January 10th, 2017

Client: Town of Plymouth

Project Details

Every system our crews delivered on this contract, item by item.

Site & Coordination

02
  • Project completed in less than 6 months
  • Site restoration and cleanup

Sewer System

05
  • Replaced 5 miles of sewer pipe
  • A portion of the existing 30" sewer force main was open cut and replaced with a 24" PVC sewer force main
  • A portion was sliplined with 24" HDPE within the existing 30" sewer force main
  • Replaced air release valve and cleanout/blowoff manholes
  • Connected the proposed 24" sewer force main to the Water Street Pump Station and Wastewater Treatment Plant