Skip to content
All Projects
Massachusetts Completed C11 / 18

Tewksbury

Bayberry Lane Culvert at Heath Brook Replacement

Town of Tewksbury, MA

Client: Town of Tewksbury

Project Details

Every system our crews delivered on this contract, item by item.

Culvert Work

03
  • Demolition of existing culvert consisting of two 36-inch CMP pipes and two 24-inch PVC pipes
  • Installation of a 15'Wx6.5'H precast concrete box culvert
  • Cast-in-place concrete walls around box culvert

Site & Coordination

08
  • Demolition of existing concrete walls
  • Installed in two phases to maintain road access for traffic management
  • Temporary stream bypass during installation with stream flow diversion
  • Final roadway pavement
  • Guardrail replacement and fencing
  • Wetland restoration and replication
  • Stream restoration
  • Loam and seed

Rock Excavation

01
  • Support of excavation

Water System

01
  • Temporary bypass of water main and temporary water service connections

Sewer System

01
  • Temporary sewer bypass

Paving

03
  • Final paving
  • Pavement milling
  • Asphalt berm

Other Projects

Bidding A Similar Project?

Whether you have an RFP ready or just want to confirm scope fit, our team is here to talk.

Get In Touch