Skip to content
24"
Maximum Main Diameter
DIP and C900 installs
30+
Years Municipal Water Work
Massachusetts & New England
0
Unplanned Service Outages
Per project target
AWWA Compliant
Fully Insured
Licensed & Bonded
Dig Safe Registered

Built for
Live Systems

Water main work runs under occupied streets and active distribution systems. We coordinate shutdowns, bypasses, and tie-ins so service stays on while pipe gets replaced.

Main Replacement

Full-length replacements with restrained joints, thrust blocks, and bedding per manufacturer spec.

Lead Service Removal

LCRR-compliant lead gooseneck and service line removal with resident notification and restoration.

Valve & Hydrant Work

Gate valve replacement, hydrant setting, and system isolation coordinated with the water authority.

Live Tie-Ins

Hot taps and planned shutdown tie-ins with bypass pumping to maintain building service.

Pressure Testing

Hydrostatic testing, chlorination, and bacteriological sampling before system return to service.

Authority Coordination

Permit, inspection, and as-built submittals aligned with BWSC, MWRA, and municipal requirements.

The Field
Protocol

Every main replacement follows a sequenced plan, locates, isolation, cut, install, test, restore. No improvised field decisions on pressure systems.

Step 01
System Review

Utility locates, valve mapping, and shutdown sequencing with the water authority.

Step 02
Mobilization Plan

Bypass layout, traffic control, and material staging delivered before first excavation.

Step 03
Install & Test

Bedding, joint assembly, backfill, and pressure test per AWWA C600.

Step 04
Return to Service

Chlorination, sampling approval, pavement restoration, and as-built submittal.

Where We
Get Called In

From lead service programs to full arterial replacements. We work across municipal and authority-owned systems.

Lead Service Programs

City-wide LSLR contracts with coordinated resident access and same-day service restoration.

Arterial Main Replacement

Large-diameter replacements on state and municipal roads with multi-phase traffic control.

Distribution Upgrades

Upsizing and looping projects to improve pressure and fire flow in aging systems.

Meter Vault Installation

Vault excavation, setting, and connection for commercial and subdivision metering.

Hydrant Replacement

Dry-barrel and wet-barrel hydrant removal and setting with main tie-in.

Emergency Main Breaks

Rapid response excavation, repair, and surface restoration for active main failures.

Operational
Standards

Our crews hold water-specific certifications and work to AWWA installation standards on every main.

Pipe Materials
DIP, C900 PVC, HDPE
Diameter Range
4" to 24"
Testing
Hydrostatic per AWWA C600
Bedding
Crushed stone per manufacturer
Service Area
MA, southern NH, northern RI
Certifications
OSHA 10/30, competent person

All water main work is performed under a written site-specific safety plan. Pressure testing and bacteriological sampling are scheduled before pavement restoration.

We provide certificates of insurance, bonding documentation, and MWRA/BWSC prequalification packages to any GC or owner on request.

Explore More

Other Services

FLOW
Public Sector & Bid Inquiries

Ready to
Replace Main?

Send us the plans and tie-in details. We will return a preliminary scope and schedule assessment.